Impact Beacon

Scene 1 — the keystone

UIN lifecycle — as-is vs as-was

The same history, restated two ways, via the merge/split lifecycle links.

Csynthesised lifecycle demo
Lifecycle events driving this demo
  • 2023-06-01 SPLIT (IPPF-000019-41): Synthesised demo event: a regional outreach affiliate splits into North and South Zone successors, to exercise the as-is/as-was toggle.
  • 2024-01-01 MERGE (IPPF-000017-47): Synthesised demo event: two youth-network affiliates merge into a single unified affiliate, to exercise the as-is/as-was toggle.

MERGE demo

As-was (original entities)
Affiliate20212022202320242025
Youth Network North100,000105,000110,000
Youth Network South58,00061,50065,000
Youth Network Unified180,000192,000
As-is (today's structure)
Affiliate20212022202320242025
Youth Network Unified158,000166,500175,000180,000192,000

SPLIT demo

As-was (original entities)
Affiliate20212022202320242025
Regional Outreach70,00074,000
Regional Outreach North46,00049,00052,000
Regional Outreach South30,00032,00034,000
As-is (today's structure)
Affiliate20212022202320242025
Regional Outreach North42,00044,40046,00049,00052,000
Regional Outreach South28,00029,60030,00032,00034,000